欧美图一区,精品一区二区人妻 超碰,一极全黄高清无码,国产一区精品自拍视频

新聞詳細(xì)


SBR污水處理工藝詳解

發(fā)布時(shí)間:

2024-04-26 08:17

SBR是序批式活性污泥法的簡稱,又稱間歇式活性污泥法,是一種間歇曝氣方式來運(yùn)行的活性污泥工藝。

  相較于其他工藝不同只需在一個(gè)池體內(nèi)按照時(shí)間順序變成不同的反應(yīng)階段。

  工作過程分為進(jìn)水階段、反應(yīng)階段、沉淀階段、閉水階段、待機(jī)階段。

第一步:從進(jìn)水開始達(dá)到設(shè)備最大容積結(jié)束。

第二步:反應(yīng)時(shí)可根據(jù)不同微生物的生長特點(diǎn)、污水的性質(zhì)和要達(dá)到處理效果,采用非限制曝氣、半限制曝氣、和限制曝氣方式運(yùn)行,通過控制反應(yīng)室中污水的溶解氧達(dá)到厭氧、缺氧、好氧反應(yīng)環(huán)境,完成多種處理功能,不僅可以達(dá)到去除有機(jī)物的目的,而且可以取得脫氮和除磷的效果。

第三步:沉淀階段,目的是進(jìn)行固液分離相當(dāng)于二沉池沉淀時(shí)間通常設(shè)置為11.5小時(shí),直至污泥絮體和上清液分離

第四布:閉水階段是從反應(yīng)器中使用潷水器將上清液排出,一直排放到最低水位。

到下次進(jìn)水開始為待機(jī)階段,可在該階段進(jìn)行多余污泥排放。

該設(shè)備具備占地面積小、構(gòu)造簡單、投資低、運(yùn)行成本低、脫氮除磷效果高等優(yōu)點(diǎn)。

SBR is the abbreviation of sequential batch activated sludge method, also known as intermittent activated sludge method, which is an activated sludge process operated by intermittent aeration method.

Compared with other processes, it only takes one pool to change to different reaction stages in chronological order.

The work process is divided into water inlet stage, reaction stage, precipitation stage, closed water stage and standby stage.

Step 1: From the beginning of water intake to the end of the maximum volume of the equipment.

Step 2: According to the growth characteristics of different microorganisms, the nature of the sewage and the treatment effect to achieve, it can be operated by non-restricted aeration, semi-limited aeration, and limited aeration. By controlling the dissolved oxygen of the sewage in the reaction chamber, it can achieve anaerobic, hypoxia and aerobic reaction environment, and complete a variety of treatment functions. In order to achieve the purpose of removing organic matter, and the effect of nitrogen removal and phosphorus removal can be achieved.

Step 3: The purpose of the sedimentation stage is to carry out solid-liquid separation, which is equivalent to the precipitation time of the second sedimentation tank, which is usually set to 1-1.5 hours until the sludge floc and the supernatant are separated.

Fourth cloth: The closed water stage is to discharge the supernatant by using a decanter in the reactor until the lowest water level.

The next water intake is in the standby stage, and excess sludge can be discharged at this stage.

The equipment has the advantages of small footprint, simple structure, low investment, low operating cost, and high nitrogen and phosphorus removal effect.

 

SBR污水處理工藝詳解

日本aⅴ精品中文字幕| 综合一区二区三区| 成人区人妻精品一区二区不卡| 亚洲欧美另类久久久精品能播放的| 欧美疯狂性受XXXXX另类| 最新国产精品拍自在线观看| 国产乱子伦一区二区三区=| 珠海市| 国产精品熟女| 国产精品成人免费久久黄av片| 日韩国产精品久久久久久亚洲| free性玩弄熟女hd老熟妇| www.日韩.com| yes44444天堂网v66| 欧美xxx| 欧美精品一区在线发布| 香蕉视频色| 久久久久国产精品一区三寸| 中文字幕一路线二路线三路线| 成人人人人人欧美片做爰| 国产精品一线二线三线| 亚洲国产精品一区二区九九| 中文无码一区二区不卡ΑV| 国产精品亚洲А∨无码播放| 久久无码一区二区波多野结衣| 777米奇色狠狠8888影视| 亚洲一区二区女搞男| 色八区人妻在线视频| 波多野结衣在线精品视频| 色妞WW精品视频7777| 青青草国产免费一二区| 少妇高潮喷水在线观看| 中文字幕日韩精品欧美一区| 亚洲精品国产高清一线久久| 国产精品爆乳在线播放| 亚洲国产精品一区二区九九| 亚洲AV永久无码国产精品久久| 亚洲人成电影| 日韩av激情| 一级a性色生活片久久| h在线免费观看|